Mclymont Creek Control Panel Next Project   >>

Project Category: Controls

Location: BEAC Control Panel Shop - Penticton

Project Summary:

Built for the Mclymont Creek Hydroelectric Project, this control panel manages two blower motors to inflate and deflate a rubber dam when the reservoir water level needs to be lowered for maintenance.

Completion Date: August 2015

Scope of Work:

  • HMI display
  • PLC Integration
  • Verification of customer specifications including point to point testing
  • Built from a schematic and wiring schedule provided by Struthers Technical Solutions
  • Built in conformance to CSA Standards which includes Hypot testing

Fast Facts:

This control panel operates from inputs from the reservoir water level, line pressure, deflation valve pressure and inflation valve pressure.